Concrete Mixer
Maintenance Method Of Concrete Mixer After Operation
Maintenance method of concrete mixer after operation:
1. Maintain the cleanness of the body and remove the dirt and obstacles on the body.
2. Check the oil, circuit and control equipment at each lubricating position, and fill lubricating oil as required.
3. Before each shift, add water to the mixing drum and idle for 1-2min, and check the reliability of the clutch and braking device at the same time.
4. During the operation of concrete mixer, check whether the noise of motor, reducer and transmission gear is normal and whether the temperature rise is too high.
5. After each shift, the concrete mixer shall be carefully cleaned.
6. If we want to ensure its technical performance, we must pay attention not to shoddy in the maintenance and transformation, and we must choose high-quality bearings.
Demand table loading...
|